A 2026 guide says the road is not uniformly paved and the surface between Padum and Nimmu is variable, with widening and surfacing still under way.
From travelcoffee.in · dated 5 September 2026 · read 17 October 2026
Trouble on the road
A 2026 guide says the road is not uniformly paved and the surface between Padum and Nimmu is variable, with widening and surfacing still under way.
From travelcoffee.in · dated 5 September 2026 · read 17 October 2026
Snow, rain, landslides and active road work can change movement at short notice; guides advise keeping buffer days.
From travelcoffee.in · dated 5 September 2026 · read 17 October 2026
Water from Lingshed nallah cut the road at km 87.2, between Nerak and Padum, on 17 June 2025; surges may recur.
From tripadvisor.in · read 17 October 2026
Snow was falling in Zanskar on 15 October 2026, the day the road was dedicated.
From pmindia.gov.in · dated 15 October 2026 · read 17 October 2026
A 2026 guide says BSNL and Jio postpaid work only within about 15 to 20 km of Padum; Airtel and Vi have little or none.
From discoverwithdheeraj.com · dated 18 August 2026 · read 17 October 2026
A blogger reports that only postpaid connections from outside work in Jammu and Kashmir and in Ladakh; no official source was found.
From discoverwithdheeraj.com · dated 14 August 2026 · read 28 September 2026
Fuel at Padum is sometimes rationed, and a guide suggests carrying spare. No written source found listing a pump between Nimmu and Padum.
From discoverwithdheeraj.com · dated 18 August 2026 · read 17 October 2026
Leh's tourist portal warns that high-altitude pulmonary and cerebral oedema can be life-threatening.
From lahdclehpermit.in · read 17 October 2026







From Wikimedia Commons, the newest dated photo near each pass and high halt. A photo shows the road on the day it was taken, not today.
Newest change in this section: 36 days ago.