Flash flood washout at Lingshed nallah
Not yet checkedWater from Lingshed nallah cut the road at km 87.2, between Nerak and Padum, on 17 June 2025; surges may recur.
When: June
History
- 17 Oct 2026First entered from tripadvisor.in
Leh to Padum
Trouble on the road
Water from Lingshed nallah cut the road at km 87.2, between Nerak and Padum, on 17 June 2025; surges may recur.
When: June
A 2026 guide says the road is not uniformly paved and the surface between Padum and Nimmu is variable, with widening and surfacing still under way.
From travelcoffee.in · dated 5 September 2026 · read 17 October 2026
Snow, rain, landslides and active road work can change movement at short notice; guides advise keeping buffer days.
From travelcoffee.in · dated 5 September 2026 · read 17 October 2026
Snow was falling in Zanskar on 15 October 2026, the day the road was dedicated.
From pmindia.gov.in · dated 15 October 2026 · read 17 October 2026
A 2026 guide says BSNL and Jio postpaid work only within about 15 to 20 km of Padum; Airtel and Vi have little or none.
From discoverwithdheeraj.com · dated 18 August 2026 · read 17 October 2026