Skip to the page
M
Meel

Leh to Padum

Trouble on the road

You opened one fact from a link
The facts next to it are below. The whole route is one tap away.

Rough, unfinished stretches between Padum and Nimmu

Not yet checked

A 2026 guide says the road is not uniformly paved and the surface between Padum and Nimmu is variable, with widening and surfacing still under way.

When: All year

Not yet checked
Taken from a published guide. No rider has reported seeing it this season.

History

  1. 17 Oct 2026First entered from travelcoffee.in

Where this came from

More in Trouble on the road

4 of 8

Water from Lingshed nallah cut the road at km 87.2, between Nerak and Padum, on 17 June 2025; surges may recur.

From tripadvisor.in · read 17 October 2026

Snow was falling in Zanskar on 15 October 2026, the day the road was dedicated.

From pmindia.gov.in · dated 15 October 2026 · read 17 October 2026

A 2026 guide says BSNL and Jio postpaid work only within about 15 to 20 km of Padum; Airtel and Vi have little or none.

From discoverwithdheeraj.com · dated 18 August 2026 · read 17 October 2026

All 8 facts in Trouble on the roadAll of Leh to Padum