Snow walls line several stretches in the first weeks, with stones coming down and a slippery surface from melt.
From tribuneindia.com · dated 11 May 2026 · read 28 September 2026
Trouble on the road
Snow walls line several stretches in the first weeks, with stones coming down and a slippery surface from melt.
From tribuneindia.com · dated 11 May 2026 · read 28 September 2026
Melt streams run across the road and are deepest in the afternoon.
From discoverwithdheeraj.com · dated July 2026 · read 28 September 2026
A rider blog reports the last petrol pump is in Chamba, with none on the way over the pass.
From discoverwithdheeraj.com · dated July 2026 · read 28 September 2026
Signal is reported to drop out after Bairagarh, so help cannot be called from the pass.
From discoverwithdheeraj.com · dated July 2026 · read 28 September 2026
Snow blocked the Satrundi to Sach Pass road on 6 October 2025, cutting Pangi off.
From tribuneindia.com · dated 7 October 2025 · read 28 September 2026
Single-lane and largely unpaved, with blind turns, loose gravel, overhanging rock and long drops. Landslides and mud in the monsoon.
From discoverwithdheeraj.com · dated 25 August 2026 · read 28 September 2026
A rider blog reports no pump on this stretch and unreliable stock at the one pump in Killar.
From discoverwithdheeraj.com · dated 25 August 2026 · read 28 September 2026
Heavy snow shut the road in January 2026; it was restored on 1 February 2026.
From discoverwithdheeraj.com · dated 25 August 2026 · read 28 September 2026
Snow closed the Bairagarh to Killar road from 6 October 2026. It reopened on 8 October, with daytime crossings advised, and snow shut it again on 9 October.
From amarujala.com · dated 9 October 2026 · read 15 October 2026
Newest change in this section: 41 days ago.
Packing list for this routeBy month, with this road’s own reasons