Issues Protected Area Permits; stops and resumes permits after snow or landslides
From sikkim.gov.in · read 28 September 2026
Open their pageIs it open?
Issues Protected Area Permits; stops and resumes permits after snow or landslides
From sikkim.gov.in · read 28 September 2026
Open their pageRoad status by stretch, with the place of each block
From mangan.nic.in · dated 24 September 2026 · read 28 September 2026
Open their pageRestores and clears the road; publishes no road status page
From etvbharat.com · dated 11 September 2026 · read 28 September 2026
Open their pageRestores National Highway 10 after landslides
From newsonair.gov.in · dated 17 August 2025 · read 28 September 2026
Inspects and restores state roads after monsoon damage
From indiatodayne.in · dated 21 September 2026 · read 28 September 2026
Decides whether the August 2026 two-wheeler proposal becomes a rule
From indiatodayne.in · dated 19 August 2026 · read 28 September 2026
About 12 cm of snow on the ground now
| Day | Snow | Low | Gusts |
|---|---|---|---|
| Thu 26 | — | −13°C | 31 km/h |
| Fri 27 | — | −12°C | 34 km/h |
| Sat 28 | — | −12°C | 31 km/h |
About 31 cm of snow on the ground now
| Day | Snow | Low | Gusts |
|---|---|---|---|
| Thu 26 | — | −16°C | 42 km/h |
| Freezing level below the pass | |||
| Fri 27 | — | −16°C | 37 km/h |
| Freezing level below the pass | |||
| Sat 28 | — | −16°C | 30 km/h |
| Freezing level below the pass | |||
No snow on the ground now
| Day | Snow | Low | Gusts |
|---|---|---|---|
| Thu 26 | — | −6°C | 36 km/h |
| Fri 27 | — | −4°C | 41 km/h |
| Sat 28 | — | −4°C | 43 km/h |
From Open-Meteo, read 26 Nov, 9:18 am, under the CC BY 4.0 licence. Global weather models, a grid about 10 km apart: a pass can be colder and windier than this. Snow on the ground is the model’s estimate, not a measurement.
No rider has told us what they saw on this road yet. What they send is kept apart from the offices above.
Each line links to the order or news report it came from.
No seasonal opening dates are announced; the lake is frozen from November to mid-May, and access since 2023 has depended on flood repairs.
A date that is missing means no source gave one. It does not mean the road stayed shut.