Skip to the page
M
Meel

Odisha: Puri, Konark, Chilika and Koraput

Rules for motorcycles

You opened one fact from a link
The rest of the route is below it.

Deomali: last stretch to the top shut for roadworks

Not yet checked

In November 2025 the 3.5 kilometre road from Deomali Chhak to the top was closed for construction, with a longer diversion by Semiliguda, Dudhari and Uparakanti. No reopening date found.

Timing · applies to All vehicles · set by Koraput district administration

No government order was found for this. It is reported as what happens in practice.

Not yet checked
Gathered from the source below. No rider and no editor has confirmed it on the road. Read the official page before you rely on it.

History

  1. 28 Sept 2026First entered from odishatv.in

Where this came from

Rules for motorcycles, on this route

3 facts

The Collector barred visitors from 8 pm to 5 am. In September 2026 entry was reported as 5 am to 5 pm, with the hilltop cleared by 8 pm.

From orissapost.com · dated 12 April 2025 · read 28 September 2026 · no rider has confirmed it

Single-use plastic and littering are banned on the hilltop, with a fine reported in the press. Picnics and parties need permission from the administration.

From odishabytes.com · dated 12 April 2025 · read 28 September 2026 · no rider has confirmed it

All of Odisha: Puri, Konark, Chilika and Koraput